Rooms all painted, flooring installed. We now are dealing with serious cleaning and repair of the bathrooms and kitchen. I was able to get the upstairs bathroom sink to plug up and then replace a gasket in the tub so it would also plug up so we could clean the jets. It's clean but there is mineral build up so we're going to have to soak some vinegar rags in the jets. The downstairs bathroom needs work. The shower stall has a hole and is cracked. I went to the company we bought it from and it's no longer made so we're going to have to replace the whole thing. We got a few quotes and we're going with the guy my wife thought was the most easy going, happens to be the cheapest price. Although, this weekend she saw the Frankie and Grace episode where the contractor take the money and all the copper pipes so she's nervous. I think it will be ok.
What we have to start doing is getting packed up. We're probably going to have to hire someone because most of the folks who have helped us have already been very generous and our friends are getting up there in age or have medical issues. Soon we can start bringing over car loads but the big stuff like a sleeper couch we have will need stronger hands. I expect we'll be in within 6 weeks. It should take a day or two to fix up the townhouse for sale.
slow but sure
January 29th, 2018 at 03:01 pm
January 29th, 2018 at 04:39 pm 1517243980
January 30th, 2018 at 09:14 pm 1517346865
January 31st, 2018 at 05:12 pm 1517418732